Vent Stacks
One of the main tasks is the installation of the vent stack, which is
included with all units.
The vent kits included in the shipping carton are sufficient for installation
in most single story buildings. If more is needed they are normally easy to
find. All vent pipes are thinwall PVC.
For more vent stack installation information, click
here.
Toilet Installation
The second main task of installing a central unit is the waste piping
installation. Click here for full information
on how to do this.
Electrical
All electric units are supplied with a power cord and pre-molded plug
which connects to a standard (3) pin 115 Volt outlet and powers both the fan
and heating element.
12
Volt fans for non-electric models can be installed in-line with the stack,
and connected to a battery which draws from an alternate source of energy, such
as a solar panel. Drains
Central units are all fitted with 1" drains, which should be connected
to an approved drain pit, container, or other facility.
Click
here for more information on handling excess liquid.
Winter Use
SUN-MAR units serve as a reliable year-round facility when prepared for
continuous or periodic use during the cold winter months. If you use your cabin
only once in a while in the winter, the unit may be used as a holding tank during
this time. If your SUN-MAR will be in use every weekend in the winter, or in
a residence, the temperature must be kept above 55 degrees F at all times
to keep the compost going.
Click here for
more information on winter use.
What's In The Box?
Click here to see what parts are included
with your Sun-Mar.
Rough-In Dimensions
Please click here to get rough-in dimensions
for all central composting toilet systems.
12 Volt Fan
Click here for more
information on the 12 Volt Fan and its installation.